Company

Production Facilities

From sample validation to strength testing before shipment — a standard at every stage.

Facilities

Production process

All three stages run on in-house equipment, which keeps quality deviation low.

STEP 01

Sample Preparation

  • Prior to production, samples are prepared to verify product specifications and quality standards.
  • Initial sample validation helps minimize potential quality deviations during the production process.
  • Stable production is carried out based on samples that meet established standards.
Sample preparation equipment

STEP 02

Product Manufacturing

  • Dedicated production facilities are used to ensure fast and reliable product manufacturing.
  • Automated equipment enables consistent quality and high production efficiency.
  • Product quality is maintained through continuous monitoring throughout the process.
Production equipment

STEP 03

Compression Strength Testing

  • Testing equipment verifies the strength and stability of each product.
  • Tests reflect real transport and storage conditions.
  • Only products that meet the test criteria are shipped.
Compression testing equipment

Talk to us about your packaging

Share your product specifications and quantity, and we will propose a suitable structure and paper grade.